a
Services & Solutions
Architectural Evaluation
Data Protection & High Availability
Performance Management
Application Design & Development
ITWatchTM Support Center
Consulting
Outsourcing
 
Application Design & Development
As a best-of-breed company with over 10 years of experience implementing enterprise software solutions that are based on cutting-edge technologies (Oracle, Java and Microsoft), Tangent Logic understands the challenges you face every day when you need to develop a complex applications:
 
  • As the market awakens, new opportunities demand quick response, but the constraints of limited resources prevent you from fully leveraging them.
  • Rapid pace of innovation today means changing technologies, new architectures and ideas.
  • Increased pressure to develop robust, secured and scalable products.
  • Economic mandate to define fixed costs for your project and not deviate from them.
 
What can we do for you?
 
Tangent Logic is an expert in designing and implementing complete enterprise products, applications or individual modules.
 
So if you need to get a quality product in four months and do not have the resources to do it on your own or want to integrate a new technology into your current architecture and need an expert to ease your way in and accelerate the learning curve, Tangent Logic can provide you with a cost-effective, maximum results solution - from start to finish.
 
What can we do together?
 
Tangent Logic ensures that each project it performs is designed properly, using industry standard architectures, design patterns and technologies. We guarantee that each and every solution we deliver is scalable, secure, multilingual (if required), robust and have good performance behavior. 
Tangent Logic has accumulated unsurpassed expertise in system integration. Our system, database and communications experts will make sure your project is installed, integrated and tweaked for top performance in the real production world, and not only in a lab with a single user.
The Robbins-Gioia Survey (2001)
"... 51 % viewed their ERP implementation as unsuccessful..."
 
The Chaos Report (1995)
"...31.1% of projects will be canceled before they ever get completed. Further results indicate 52.7% of projects will cost over 189% of their original estimates. ..."
"...only 16.2% for software projects that are completed on-time and on-budget. ..."
The IT Cortex Conclusion
  • an IT project is more likely to be unsuccessful than successful
  • about 1 out of 5 IT projects is likely to bring full satisfaction
  • the larger the project the more likely the failure

Tangent Logic 2009. All rights reserved. Created by A-op